Utilities and Infrastructure Electricity Provided by Vietnam Electricity (EVN) by 110KV line to a substation inside the industrial park, distribution lines of 22KV to all factories. Amata B. Grimm Power operates a 12MV power plant serving as support and back up. Supply Water Supply water told capacity of 30,000 m3/day, with a standard quote of 50 m3/day(negotiable) Waste Water - Own treatment plant with a capacity of 12,000 m3/day- Waste water effluent is calculated as 80% of supply water consumed Telecommunication: - Provided by VNPT Dong Nai, optical fiber is installed and available to each plot